Long Wall Training Simulator

mine_ugnd_lw_002.jpg

Controls
Before a trainee can control the virtual Long Wall, he/she needs to master the different controls. The Shearer Information Screen is situated at the bottom-left. This screen provides feedback as to the status of the shearer. The shearer is started with the Shearer Control Panel (bottom-center). This virtual panel is operated via mouse-clicks. Once the shearer has been started, it may be controlled with the Shearer Remote Control (top-right). The Shearer Remote Control may be operated via mouse-clicks as well. A real Shearer Remote Control, interfaced to the simulator computer, is normally used. Once a trainee has mastered the controls (pre-simulation mode) he/she may graduate to the main simulator.

PreviousNext
Back to Product Page

About Copyright:
The above image may be reused and/or published under the condition that 5DT is acknowledged as follows: "Image courtesy: www.5DT.com".
HOME | CORPORATE INFO | PRODUCTS | DOWNLOADS | PRESS RELEASES
  MEDIA KIT | CONTACT US | CUSTOM DEVELOPMENT
  DISTRIBUTORS & RESELLERS | ORDER FORM | PRICE LIST
VIRTUAL REALITY INFORMATION
 E-Mail:
info@5dt.com
Copyright © 1999-2004 by Fifth Dimension Technologies. All rights reserved. Webmaster: webmaster@5dt.com